Answer Posted / abid hussain
portland prozzolon cement
Is This Answer Correct ? | 28 Yes | 1 No |
Post New Answer View All Answers
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
What are some facts about concrete?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
how many material required for brickbat water proofing of toilets.
What type of tensile strength is handling by crank in beam? Thanks.
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
How do you calculate the power of a centrifugal pump?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
What is Heavy Concrete & Normal Concrete
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
how to take concrete quantity for precast segment for viaduct project?
what are the types of dimensioning?