Answer Posted / sunil
is-1489
| Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
use ofr concrete as per grade ?
Formula of area of crane hook
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
how to remove the quantity of metal 1 and metal 2 in concrete
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
explain what do you mean by the property development.
What is absolute coordinates?
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
what r the precaution for high in atp tempareture,low in atp tempareture
How many lbs are there in a yard?
Who name us Engineer & Why?