in the footings first which reinforcement bar has to be
layed as per design criteria.
Answer Posted / sivalingam
Shorter span reinforcement should be placed first
| Is This Answer Correct ? | 8 Yes | 8 No |
Post New Answer View All Answers
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
How to get MEP technical,instaaltion & testing data for interview?
how much cement and sand required for 1cum rr masonry
How to calculate steel for beam slab and column
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
2nd and 4rt angle elevation used in which country ?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Why joints are provided?
What is absolute coordinates?
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
how to calculate freeboard in under ground water tank and technical details
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
why we use 19x9x9and 20x10x10 but not other
how to calculate spacing rod in column