Answer Posted / rajeshkumar
13.5
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is modular brick and it size
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
Which is the direction of negative angle?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
psc girder detail
List out the types of roofs?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
what is kribs is supporting?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
What is meant by scaffolding coefficient?
What is the use of mirror command?
What is the distance between railway tracks?