WHERE IS THE LIGHTING ARRESTER SHOULD BE PLACED IN
DISTRIBUTION LINES?
Answer Posted / aditya
Why LA is kept near to the transformer??
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Batteries used for electrical energy storage are a. Laclanche cells b. Edison cells c. Lead acid cells d.any of the above
If we impress a dc voltage of 230 V on an unloaded 230 V, 50 Hz transformer it wi A give high secondary voltage B burn out C give secondary voltage as per K D none of these
After taking shutdown of 11kv feeder, if you see 5kv by phasing stick in the cable side, is it possible to close earth switch in cable.
If we use 250A MCCB as a incomer in Control panel for a fault level of 50kA for one second ,assuming temperature rise from 85 Deg. to 100 Deg , Then what will be the Aluminium Bus-bar size for 250A MCCB? Explain in detail.
What is the significance of integral controller and derivative controller in a pid controller?
How we can defined theecopper cable size if we know the aluminium cable size?
How to know the Max. current caring capacity of the cable by its size ?
What is non-minimum phase transfer function?
why is using sensor?what is differece between photoelectric and proxmitty?
what the principle of sincroscope?how it works?when it needed?
What is knee point voltage of transformer?
if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.
what are the maximum available current, voltage ratings and switching speeds of the power electronic devices thyristor, power mosfet, igbt, and mct?
How to calculate Ith (I thermal) for curent transformer
What will be the fault current of any system when its generation is 10% of BASE generation( FUll Load )?Will is 10% or the same as full base calculation?