Answer Posted /
Is This Answer Correct ? | Yes | No |
Post New Answer View All Answers
how to apply b license to c license in tneb
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
What is the purpose of a volatile variable?
Can Tableau be installed on Mac OS?
how to modify 12% to 13.5% in tallyerp9 release 1.6
2500 Value in which type of access list?
Explain security types in asp.net?
does any one has gate solutions of 2007,08,09 metallurgical engg papers?
How do I save a powershell script?
Explain where can I find the time on satellite pictures? What time zone is this?
How do stubs function in a web logic cluster?
How do you see your career at Applebees?
Why doesn't C support function overloading?
How to handle a web browser resize operation?
How to handle events in d3.js?