an off load but energized 11/0.4 KV, 1250 KVA T/F has a
power factor of 0.65(capacitive)..!! why is it so, though
T/F being an inductive device ??
Answer Posted / rajesh verma
Dear
It is not possible. As the transformer is a inductive
device it can only lead to Lagging PF although it is idle
but there was definitely Lag PF the one possibility is that
the transformer is feeding to capacitor panel and because
it is off load so the resulting PF is Leading second thing
can happened that PF relay not working in auto made and
somebody has connected direct capacitor without calculating
the required KVAR to maintain transformer off load PF
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
when generator short circuit condition, the current how dissipates. or at short circuit voltage not available then current how can flow?
What current flows in the transformer primary when its secondary is open?
It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.
features of hbc fuses
What are the main parts of central chiller plant? Explain the function of each stage.
What is meant by coupling capacitor?
What are test values for an 63 KVA and 100 Kva Distribution Transformers for the following typical tests 1)Magnetic balance 2)Short circuit test 3)Open Circuit test 4)Vector group confirmation test .please give me the standard values for all the above tests.
How many gap between finger contact in a.c.b. and v.cb.?
What is the disadventage of gland earthing(power cable) if any. ?
what is the difference b/w absolute encoder and incremental encoder?
is it necessary to earth the rmu before cutting off the transformer winding?if yes why?
what is the stear deltaprinceple?
why in the three pin plug all 3 pins are cutted ?
i am gng to visa interview this july i have 4 backlogs gre 1010,toefl 75,pls give me the tips pls pls
orifice sizing how done, checking & selection