Answer Posted / alibaba
20*10*10 cm
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
At what point does a circle start losing area when being flattened?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
What is the per cu. mt. price of ready mix in Gujarat region.?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to calculate number of bitumen for road asphalt
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
explain five benefits of using standard terminology in the measurement process?
how to nfind out the specific gravity of sand.aggregate,water please help...
though u r a civil engineer, y r u interested in tcs???
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??