why the earth conductor in top of the tranmission line ?
Answer Posted / roy.bijoy067
bcz in electric system earthing priority first then conduction.it lighting come then it first get earth conductor then phase voltage.so this high voltage easily come to earth and protect electric system.
| Is This Answer Correct ? | 16 Yes | 0 No |
Post New Answer View All Answers
how did the testing of protection relays done through current injection
What is the temperature PROFILE OF A FLUID W. R. T. Distance from a sphere to which it is IN CONTACT which is at constant temp.?
how we can explain arc heatng?
What is the difference between Generator Differential Relay and Transformer Differential Relay?
WANTCONTACT NUMBER & EMAIL/ WEBSITE TO CONTACT THE SECRETARY,MADHYA PRADESH LICENSING BOARD(ELECTRICAL),K- BLOCK,3RD FLOOR,SATPOODA BHAWAN,BHOPAL
what is a bus riser in power system and why it is used
why the difference arise between HT reading & LT reading (submeters fixed in complexes, apartments etc)if the power factos exceed from 0.9 to 1 can the ht meter reads fast?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
A 400 V, 50 Hz, Δ connected synchronous generator has a field reactance of 0.1 Ω and armature resistance of 0.015 Ω. At full load, the machine supplies 1200 A at 0.8 pf lagging. Under full-load conditions, the friction and windage losses are 40 KW and the core losses are 30 KW. What is the machine’s overall efficiency? Ignore any field circuit losses.
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
Why GRR starts from 60% of motor speed why not less than 60%?
where rlc series ckt used?
How can we connect additional batteries to three phase ups? What are parameters we have to check when connecting?
Salient pole alternator is more stable, why?
what is sevice settings for mccb?How can be it setted?