why we condut tan delta test i want brief explain?

Answer Posted / sajid shaikh

Tan delta is called loss angle or dissipation factor
testing,is a diagnostic method of testing winding to
determine the quality of insulation.This is done to try to
predict the remaining life expectancy & in order to
prioritize replacement.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How do i perform grounding of star point of Genset (400V) for making connection with step up transformer of DELTA-DELTA (400V to 20KV) ? while Genset itself has its own neutral and grounding bus bar inside genset breaker box whereas we have another neutral and grounding busbar in synchronizing panel next to genset at maximum distance of 6meter, would someone pls advice if we can only perform neutral grounding in synchronizing panel or should we ground neutral on both places inside genset breaker box and synchronizing panel.

1256


what is differnce btwen lll and lllg faults

1507


What is an iron loss or core loss pi?

623


how can we make cable shedule for controll wiring ? which details must be required for it.?

1632


when ac current flows thru d coil of a contactr,it energizes,magnetic field attracts d contact of the coil...nw wont dt ac current in d contct induce current back on to d coil thru mutual inductance leading to high currnt in d coil

1259






what r substations?what r there work?why voltages r incresed and then reduced during distribution of power

1463


Explain what is rated speed?

668


i completed my DEEE. and i want to electrical c license. how to get it..?

1688


what is the difference between linear choke and suction choke?

2172


why r we using shell transformer for low voltage

1534


How to calculate cable size by using load.?? Any formula...

897


Why induction motor is widely used in industry

2257


What is icu and ics in Acb and how many time icu or ics passes from breaker?

1042


why do we need to use 3c+3e cable, normally i select only 3c+e cable and i think it is enough. pls explain the usefull of 3e cable ( in this project the earthing system is well done)

1996


If not into production, how far did you follow the design and why did not you see it into production?

1706