Answer Posted / amit n sangani
ON MY BEHALF INSIDE BETTERY LIMITE IS TILL THE LOC OF THE
CONTRACT AND OUSIDE BETTERY LIMIT IS OUT SIDE OF LOC LINE
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
how to control the speed to switched reluctance motor
what is mean by parallel operation of permanent magnet generators
how to calculate the distance relay faulty zone?pls explain?
What is the difference between grid and off- grid system??
internally connection of photvoltic module
What descriptive information does the NEC require to be marked on all conductors?
what is the setting of locked rotor in HT motor ? (answer expecting in percentage)
any one please tell taht what type questions will be asked in BHEL interview, i am having interview on 24th Dec, please send this to mail pradeepsistam@yahoo.co.in
hi everybody how to design string combiner box (scb) internal parameters like bus bar and spd (surge protection device and fuse which place to set that,and also bus bar one particular cross sectional how much heat generated and how much power loss tell me Clearly and briefly
what is meant by twilight switches 7 where its applicable ?
how much allowable resistance that can be difference in motor all coils?
for 100 HP Induction motor service factor is 1.2(SF) we placed a VFD at the motor side load is balance with 0.3 Amp's Phase to Phase but at incoming of VFD load is un-balance with 10 to 20 Amp's what will be cause of load un balance
Single line diagrams for star to delta and DOL starters.
Readings of ER300P Trivector meter
What is given by the definition in BIL IMP/PF = 950/395 kV. This was found in a name plate of a power transformer.