WAS PUMP MODEL WXB DESIGNEDIN ACCORDING API 610 STANDARD?
Answer Posted / serge
From Flowserve's brochure:
"WXB pumps are manufactured to individual customer
specifications, which are often based on ISO 13709/API 610
(BB5)..."
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is shuttering co efficient?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
What is the development length given in pile?
what motivates you to do a good job
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
what discoveries did you have in relation to your course?
Explain the difference between shear and tensile strength.
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
in 100 cft = 1350 bricks in 100 cft = ? bloks
trapozidal
what is civil all interview questions
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?