In all analog voltmeters or ammeter showing some small size symbols. as well as a star and in star 2no. digit, resister symbol,and other. what is that's meaning ?
in the directional overcurrent and earthfault protection,normally we are setting the angle 45 deg lead for phase fault overcurrent and -45 deg lead for earthfault fro forward direction.but both the fault are operating on the same angle region only.why?how the relay will response?
Terminal blocks is used for segregate the connections... There is any principle for terminal block..?
features of hbc fuses
Why does the radius of armature is less than the radius of pole shoe?
how to carry out Magnetizing Current Test on Distribution transformer and what purpose we are doing this test. why transformer rating in always in KVA ? what ispositive, negative, zero sequence impedence? How ElCB tripping if Neutral touch with ground Why AC & DC capacitor are use in UPS ? why motor rating in KW? how to syncronize two dg sets
How to dimensioning SDCCH, LAPD and CS7 signaling on GSM?
state the working principle of incondenscent tube?
33kv Rated output avilable in market (any where in india)
How to select batteries required for ups and the inverter if we Known load? And how AH is selected of battery?
1)How much current can a 3-1/2 core 100 mm wire carry? 2)What are the special cables required for explosion proof wiring? 3)In case you do not have coal and salt for earthing, how can you achieve good temporary earthing? 4)One horse power single phase motor is more likely to get hot than a one horse power 3 phase motor. Is it true or false, if true why? 5)What are the different types of soft starters for large motors?please explain?
what is a reactive power? what is the relation with power factor?
i am going to attaned the engineer (disign)iterview at HAL please give me duid line
Is it required to lay GI wires along with GI/MS conduits from one point to another point though separate earthing cable is conncted from DB to Socket?
how to changeover ups in this power failur time?