for 100sft of Cement plastering ratio 1:6 How much quantity
of cement and sand required.
Answer Posted / ahmed jaleel if any clarifica
100/3.28^2=9.29
1:6
The theekness of Plastering is 12mm
Sand is Requried in 1 cubic Mtr =1.25
Cement Is Requried In 1 cubic Mtr 1.25/6= .21
9.29 * .012 = .11148 * 0.21 =
.023 * 1440 = 33.71 Kgs Is Cement Requried.
( With Out Westage )
Sand = 1.25 * .023 = .02875 Cubic Mtr Sand Requried. ( With Out Westage )
Is This Answer Correct ? | 60 Yes | 16 No |
Post New Answer View All Answers
What is the difference between chamfer and fillet?
At what point does a circle start losing area when being flattened?
How to calculate chejja reinforcement
What type of tensile strength is handling by crank in beam? Thanks.
What is Base Shear ?
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
Explain the different types of building contracts?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
Define What does civil status mean?
What is the basic difference between OPC
How to calculate paint drums per meter square
What are wooden shingles?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters