Answer Posted / g himanth kumar
For the concrete with different grades the strength development for 7days is approximately 60 to 70% of its 28days characteristic strength.
Is This Answer Correct ? | 14 Yes | 4 No |
Post New Answer View All Answers
indian standard split spoon sampler
How do you determine specific gravity of cement?
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
in plate load test what is the thickness of plate 20mm 5mm 50mm none
how can calculate cutting length of diamond ring
what is the meaning of 40/20 src
List out some of the common problems that architect have to tackle it?
Describe a time when you anticipated potential problems and developed Preventive measures
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
Which stone is best for wall construction Laterite Stone or Cement Blocks
How to calculate steel for beam slab and column
Pls explain me about tension and compression in a flat slab
What is dead load impact load live load
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????