Answer Posted / dashah2712
1 cum = 1000 Lit of water
= 1000Kg (SP of water is 1)
= 1000 Kg.
Is This Answer Correct ? | 40 Yes | 10 No |
Post New Answer View All Answers
Types of column foundation and how to calculate its steel quantity.
Is there the dry coefficient of cement is constant?
What is costing in 100squre feet bricks
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What do you mean by the word 'shear'?
1m square 20mm plastering how much of water need curing work
What are the alternate material for steel, Sand and aggregate
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
How to check slab shuttering level.? Or check list for slab ?
How to plan a project
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?