what should be the quantity of water in m20 cocnrete /per
bag cement-- whats the formula

Answer Posted / jitender mishra

the watter is mix in cement weaght of 30%

Is This Answer Correct ?    1 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which is the direction for positive angle?

731


if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

1622


3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.

1635


Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?

1442


what is the anchorage length of reinforcement.

1305






Where is the worlds longest elevator and how long is it?

697


Floor tile measurement? Wall to wall or skirting to skirting

1375


When was the first motorway built in england?

654


What is the difference between yeild strength and compressive strength of steel???

1794


Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice

2191


For what purpose bedding is used under storm water drains, explain?

755


What is the formula for figuring out how many gallons of water are in a pipe by the foot?

658


What is meant by engineering drawing?

664


how many spacers we need for 1 ton reinforcement? aprox.

4918


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1530