is 3-phase induction motor need a starter ? why do it so

Answer Posted / avvkishore

safety and protection purpose

Is This Answer Correct ?    5 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

A 3-PHASE TRANSFORMER IS USED TO STEP-DOWN THE VOLTAGE OF A 3-PHASE, 11KV FEEDER LINE. PER-PHASE TURNS RATIO IS 12.FOR A PRIMARY LINE CURRENT OF 20A, CALCULATE THE SECOUNDRY LINE VOLTAGE, LINE CURRENT AND OUTPUT KVA FOR FOLLOWING.A)STAR- DELTA.B)DELTA-DELTA.

2459


what r the safety measures in UPS ? explain all?

1786


What do you mean by Stimulastion Test in Diesel Genarator / Why & when it's conducted ?

1221


in my industry we are using 3 step up transformers for induction heaters..i.e 415/580v and other are 11/440v.in power consumption does a step trnsformer makes any difference compared to step up?? plz explain

1440


In electrical locomotive engines, the DC series motors is being used as traction motor. But in new engines like in WAP7 & WAG9 the 3-phase squiral cage induction motors has replaced them. So can someone tell me the advantages of induction motor over dc seris motor in engines points of view....???

2004






May I know how much values to be set for earth fault, over current and short circuit values at 11kv side? I have 11kv van 1250amps rating. Present it's taking load 80amps?

1030


how to control the speed to switched reluctance motor

1505


Whether amorphous core transformer is available in India?.If available then up to what rating of voltage and KVA?.

1308


How you calculate the repturing capacity of a HRC fuse

2113


in science exhibition how lamp can blink when you clap near the lamp ? thank you

1509


how to extend relay operating timing in 24V dc relay card (without using Timer )

1473


Could the power factor on electrical system can affect the registration of the kwhr meter or the CT/PT? 

1464


what is the formula for hv test for cable and circuit breaker..????

1552


We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.

1614


what is the acceptable limit value for Desolve Gas Analysis/

1448