Allowable wastage for ready mix concrete?

Answer Posted / sandy

this may depend on method by which u r doing conc.
1) Drop & Pick = manually
2) Chut method
3) conc. pump

Is This Answer Correct ?    2 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the problems one might face while having a Cantilever balcony?

1039


in one SQM plaster how much Cement and sand consumed in ratio 1:4

1667


how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail

3492


sir please send me campus placement questions in civil engineering

3127


how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?

5728






1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?

2024


How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM

1502


Formula of area of crane hook

1523


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2390


water leak detection system question & answer

1936


what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)

1277


660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need

1102


what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE

3597


How can I make justification between using concrete grade c35 compare c37?

1093


what is called the inverd level of mabhole chamber?

1628