Allowable wastage for ready mix concrete?
Answer Posted / sandy
this may depend on method by which u r doing conc.
1) Drop & Pick = manually
2) Chut method
3) conc. pump
Is This Answer Correct ? | 2 Yes | 6 No |
Post New Answer View All Answers
What are the problems one might face while having a Cantilever balcony?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
sir please send me campus placement questions in civil engineering
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
Formula of area of crane hook
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
water leak detection system question & answer
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
How can I make justification between using concrete grade c35 compare c37?
what is called the inverd level of mabhole chamber?