I am an electrical contractor in noida, I am registereg in
noida vat. i got a contract in Delhi State, my party told
me that we shall deduct WCT @4% & reimburse Service tax all
in composite scheme.
Now Problem is this,
1 Can i able to purchase outside the delhi?
2 Can i produce a c form to our vendors?
3 What is limitation of purchase from outside the Delhi?
4 What % of tax Govt will levied upon me?
5 How can i take credit of tax paid upon purchase made by
us.
So, like these type questions i have in my mind if any
person know the right answer please write to
sksproj@gmail.com or contact me on - 8010076534 /
9212758177 / 9718378190.
Thanks with Best Regards,
S.K.Saxena
Answer Posted / lol
call architect
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
oltc of a transformer, how it works? and what are the equipment consist of describe briefly?
If a air condition consume 2.50 to 3.00 amp then how much it will consume in watts if it is running 10 hours out of 24 hours????
Damping resistor provided in open delta (tartiary) winding of a measuring PT at the incoming of a MV inverter drive panel is getting heated up. Can any body explain the reasons and suggest the remedy?
what is the difference b/w pvc cu conductor and cu breaded wire..?
Different types of relay fault which phase sequence??
Why is the frequency not changed during transformation of electrical energy in a transformer?
What is gain margin?
what is the difference between earth leakage and earth fault?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
advantages & disadvantages of Lagging and leading power factor .
we have two motors 1250kW,6.6kV to be coupled on the same shaft ,so please provide assistance for their synchronisation.
Explain what cmos is and its benefits?
why the making current is more than then the breaking current and if its true then its about a controling circuit or breaker power contact points
i am going to give the JSEB,RANCHI exam for power plant,so i need some samples of papers related to that,so please send me these papers by my mail id.
Refernce currents are to be generated using refernce cueernts how can this be done