I am an electrical contractor in noida, I am registereg in
noida vat. i got a contract in Delhi State, my party told
me that we shall deduct WCT @4% & reimburse Service tax all
in composite scheme.

Now Problem is this,
1 Can i able to purchase outside the delhi?
2 Can i produce a c form to our vendors?
3 What is limitation of purchase from outside the Delhi?
4 What % of tax Govt will levied upon me?
5 How can i take credit of tax paid upon purchase made by
us.

So, like these type questions i have in my mind if any
person know the right answer please write to
sksproj@gmail.com or contact me on - 8010076534 /
9212758177 / 9718378190.

Thanks with Best Regards,

S.K.Saxena



Answer Posted / lol

call architect

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

oltc of a transformer, how it works? and what are the equipment consist of describe briefly?

1568


If a air condition consume 2.50 to 3.00 amp then how much it will consume in watts if it is running 10 hours out of 24 hours????

1448


Damping resistor provided in open delta (tartiary) winding of a measuring PT at the incoming of a MV inverter drive panel is getting heated up. Can any body explain the reasons and suggest the remedy?

2533


what is the difference b/w pvc cu conductor and cu breaded wire..?

2883


Different types of relay fault which phase sequence??

468






Why is the frequency not changed during transformation of electrical energy in a transformer?

836


What is gain margin?

623


what is the difference between earth leakage and earth fault?

1740


(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)

1419


advantages & disadvantages of Lagging and leading power factor .

9084


we have two motors 1250kW,6.6kV to be coupled on the same shaft ,so please provide assistance for their synchronisation.

1634


Explain what cmos is and its benefits?

645


why the making current is more than then the breaking current and if its true then its about a controling circuit or breaker power contact points

1609


i am going to give the JSEB,RANCHI exam for power plant,so i need some samples of papers related to that,so please send me these papers by my mail id.

3011


Refernce currents are to be generated using refernce cueernts how can this be done

1782