how many cubic ft. for 50 kg ( 1 bag ) cement?
Answer Posted / 1231421
WE know 1cum= 35.32 cft
and 1 bag cement = 0.033cum
thus 1 bag cement= .033*35.32 cft
= 1.16556
| Is This Answer Correct ? | 107 Yes | 73 No |
Post New Answer View All Answers
What is meant by cad?
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
I want to join bhel because
What is meaning of tlc
How do you change a dimension value in solidsworks?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
whats is difference between anchorage length and development length
what is detail procedure of eccentric footing? plz. give solved exmple?
Types of column foundation and how to calculate its steel quantity.
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
What is costing in 100squre feet bricks
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item