suppose we have a tendency to make a hole on the surface of
the beam, than where we goes to make it?
Answer Posted / n sudheer
center of beam
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
what is the types of surveying?which type of survey carrying for type of work?
please send me bhel questions on rupesh.017@rediffmail.com
What is zoning permit?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
What type of tensile strength is handling by crank in beam? Thanks.
I need to constructive work in amaraj batteries
why development length = 50D . why not 100D
where can i get the previous question papers for rrb section enginerr (civil)
How to calculate carrying capacity of the existing water supply trunkmain
What is change order request?