how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)
Answer Posted / akbar khan
if you tell about both in this context,it will be highly
appreciated.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are the types of design? which type of method is used at what type of design & why?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Describe the role of independent Quantity surveyor?
How much cement and water required for cement selery????
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
what is civil all interview questions
How to calculate Volume of Wet cement concrete for a specific grade?
what is stressing
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
In cement making,what is meaning of blend,fineness,density.
How to calculate the crank rod in slab
115mm thickness brick work how to required mortar
What is the difference between tor steel and tmt steel?
Explain the Strength of brick?