how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)

Answer Posted / jitender kumar mishra

you mixing the mixer machine or baching plant

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??

1805


Why joints are provided?

687


Why Vitrified tile are getting pop up.

536


how many kg of 20mm, 10mm, dust available in one ton stone boulder

1434


how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

1972






How much cement,sand,bricks and water needed for 1square metre brick work?

1345


what is the criteria for the finalisation of pavement thickness in road project?

1594


explain five benefits of using standard terminology in the measurement process?

1579


What is specific gravity???

882


how to calculate number of bitumen for road asphalt

973


how to convert sand in Cft to Kgs

1484


what is the weight of 6000 psi concrete in lb/cft?

3105


What is the use of extruded feature in solidsworks?

779


Why the finite element method is lower bound solution?

2318


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.

1878