Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?

Answer Posted / saif raza

As deshuttering period is desrcibe in IS code for diffrent
structural member.
for deshutering purpose minimum strength required is
between 65 to 75% & concrete gain more then 65% atseven
days so it is safe to remove.

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate weight of 1.8 cum of aggregate

1297


How do you calculate reinforcement weight of steel?

673


how many running meters in one kilogram of 4mm pvc coated chainlink fencing

644


What is meant by scaffolding coefficient?

2189


all technical question

1684






what is high type road and low type roads

1192


16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.

17752


What is the formula for figuring out how many gallons of water are in a pipe by the foot?

657


hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

1824


What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete

6268


How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1430


how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?

1577


relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

2395


is concealed wiring a problem in fly ash brick wall?

2072


Define What is the tensile strength of wood?

677