1# Brick required :- 650 nos
2# Cement :- 1.23 bags
3# Sand :- 0.25 cum

Is This Answer Correct ?    4 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

When column of building is abutting the boundary line,then suitable footing advised is

1958


Types of column foundation and how to calculate its steel quantity.

1445


suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?

1668


What are the common ways of demolition?

724


how much one carpenter can doing shuttering of slab in one day

2885






 rcc floor to floor  4m. in column reinforcement where we provide lap in exact location.     

1488


Which stone is best for wall construction Laterite Stone or Cement Blocks

1320


what is the types of door's wood?

1595


What is the coeffiencent Friction Angle between Steel and Ashphalt?

2522


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1646


What is difference between code and standard and specification?

1806


what is tension footing?

1541


how to calculate freeboard in under ground water tank and technical details

2684


The mixture of different ingredients of cement is burnt at?

1107


What is M40 _ TOR - EQ and B.F.S

2023