How do you derive the quantity of cement & sand in brick work
construction in 1Meter cube, using CM 1:6 and bricks of size
19*9*9 cm
Answer Posted / saif raza
1# Brick required :- 650 nos
2# Cement :- 1.23 bags
3# Sand :- 0.25 cum
Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
When column of building is abutting the boundary line,then suitable footing advised is
Types of column foundation and how to calculate its steel quantity.
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
What are the common ways of demolition?
how much one carpenter can doing shuttering of slab in one day
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
Which stone is best for wall construction Laterite Stone or Cement Blocks
what is the types of door's wood?
What is the coeffiencent Friction Angle between Steel and Ashphalt?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
What is difference between code and standard and specification?
what is tension footing?
how to calculate freeboard in under ground water tank and technical details
The mixture of different ingredients of cement is burnt at?
What is M40 _ TOR - EQ and B.F.S