how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / sumanth
we can only calculate the quantity in m3 only after that we
can converet in c.ft.
1/4 x 1.54 x 28.8= 11.08 bags cement for 1 m3 for the ratio
of 1:1:2
s0 731 cft = 20.719 m3 * 11.08 = 229.570 bags cement used
1/4 x 1.54 = .385 m3 sand for 1 m3
so 20.719 m3 x .385 = 7.976 m3 sand required in 731 cu .ft
2/4 x 1.54 = 0.77 m3 chips ( aggregate ) for 1 m3
so 20.719 m3 x 0.77 = 15.953 m3 chips required in 731 cu .ft
| Is This Answer Correct ? | 15 Yes | 10 No |
Post New Answer View All Answers
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
What is a kip?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
pls give me ans to ACT formula cube testing porpuse
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
Which are the top apps for you civil engineer?
density of crush sand & crush stone or grit powder
What is binding spacing of the rebars at lapping zones.
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
why we use aggregate,sand with cement in concrete?
What is the distance between railway tracks?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
Did any of the egyptian pyramids ever fall down?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )