What is Integral and Derivative control?
Answer Posted / jagadeesh
if the error is reduced by increasing or decreasing the
duration then it is known as integral controller and if the
error is redued with respect to the rate then it is known
as derivative controller.
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
What is Droop? What is Step/Gradient Limiter in Turbine Governor control?
give some question relative instrument fitter?
What are the charcterstics of a P&ID controller block for Governor speed raise or lower for a load sharing functionality between 4 Gas turbines in droop mode.
we have level transmitter for h2s04 storage tank capacity 10k ,always there are failure of transmitter due to failure of magnetic floats ,please come up with solutions at the earliest.
hi friends,im an instrumentation and contol engg student,can u hlp me of suggsting barc written question paper,my id is roysuvaranjan@gmail.com, cel no.9563591747
Difference between dcs and plc including date processing and architecture.
kindly sent some demo question and answer
who's take first position in process in the timing of new installation flow transmitter and control vavle. give the answer with logical trick.
Which is your favourite subject & explain any one topic of it.
Explain the working of an enraf level gauge.
There are two chlorination tonners both are connected to two pressure swithes and the pressure switch is connected to SOV which operates the valve to changeover the tonner selection i.e if pressure one tonner goes low the other tonner should come in line if it is inautomatic selection design a circuit using relays ?
what should he know if he is an assitent engineer instrumentation in cement industries of experience of 10 - 15 year.
the 3 most common transmitter protocol being in refinery or qatar gas and aramco.
The Design Calculation of Level Transmitter For Different Structure open & Closed Vessel, Eg. Diff. Level Tx., Capacitance For Continous Operation
If i have 4 Allen Bradely make RS logix 5000 PLC and for viewing that we are using 4 RS view SCADA for 4 different packages. Now, I will want to view two packages on only one SCADA. Then how i will do it?