what is the meaning of HART ?

Answer Posted / aatif alvi

H.A.R.T Stands for Highway Addressable Remote Transducer

This is a communication protocol(e.g Field bus,Profi Bus e.t.c) that is used between different PLC and Field instruments

Is This Answer Correct ?    34 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Area classification, Equipments, Gas groups, temperature classification, Ingress protection, Fire Extinguishers.

1505


What is the difference between working pressure and calibration pressure of a control valve

2592


give some question relative instrument fitter?

5805


What is the purpose of LO Overhead tank in turbines.

1585


What is the formula of vabration sesore. i mean how to covert mils to volt plz share if any body knows   very argent : my mai is merajalam143545@yahoo.com

2044






I will attend an interview with GasGas company for a position of Instrument Technician ( Offshore )in next month can anyone tell me what questions they will ask. Thanks in advance.

1657


i need some objective type questions in instrumentation

4486


䑰ҕ䔈ҕ䖠ҕ䘰ҕ䛀ҕ䝐ҕ䟐ҕ䢐ҕ䥐ҕŹ

1528


Q- Control problem are mainly classified in _____ types. a-)4 b-)3 c-)6 d-)nono of these Few of them i know is 1- regulator type problem (eg- Air conditioner) 2- tracking problem (eg missile trcking problem) 3- sybernatics 4- optimal control problem

1742


we are using centum vp as monitoring with Dell precision work station T3600 but some times PC(s) are restarted automatically . how we can solve this problem? thanks

1772


How to check vortex flow meter is in good condition while we do not having calibration setup?

7537


hi my name is rakesh patel i just complited my be in instrumentation & control now i am going to working as a validation engineer in a poject department so what is a scope in a future as a validation engginer ? what line is good for me can any bady give me complete solution please? your regard rakesh patel

1524


while am calibrating Drager polytron 2IR flame gas detector occured non zero status.how can i get zero status?

1716


How to erection of DCS Panel at site step by step

1003


Gas equation

1416