what is the functional requirement of cement plaster in RCC
members & masonry??
Is it Manditory to do plastering on all RCC members(beams,
Columns, Slabs)?
in what places plasterring could be kept as an optional
one???
Answer Posted / mohammed mohiddin
1.
a> To prtect the structural or any masonary members from
weathering agent.
b> To impart aesthetic look by giving sophisticated
finish.
2.
It is advisible as an additional protection cover for
the RCC cover especially in the region where the members
are exposed to saline weather in coastal area.
3.
a> Where the good finishing is not required
b> Where the economical building required as mentioned
above
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
What is thumb rule for deep trench excavation
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
Is there the dry coefficient of cement is constant?
The concrete slump recommended for beams and slabs; is?
How to come 1.54 from dry to wet concrete?
What are wooden shingles?
What is costing in 100squre feet bricks
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
from where ican get sample papers for CET-delhi 2012
roll of DLC in road constructions
Floor tile measurement? Wall to wall or skirting to skirting
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.