what is the difference between NP2 Class and NP3 Class RCC
Hume pipes
Answer Posted / modipraveen
Those are Non Pressure 2 and Non Pressure 3
| Is This Answer Correct ? | 11 Yes | 12 No |
Post New Answer View All Answers
Which are the top apps for you civil engineering?
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
I want to join bhel because
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
how much area can be platered by a mason for exterior
how to calculate the size of triangular ring in rcc column?
what is floating slab foundation?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
how to calculate load bearing column
types of piles detail,
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
How is improve my knowledge in construction industries....
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
Is there the dry coefficient of cement is constant?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton