The document / drawing that is primarily used in depicting the
“Bill of Materials (BOM)” of piping system is the
Answer Posted / guest
The document which incorporate the "BOM" and which is also
used for the installation guide for piping is "installation
diagram" or "hook-up diagrams"
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Specify ideal accuracy of flow element like orifice plate, Ventury, Annubar. Ultrasonic flow meter etc.
How can measure flow in oil line?which type of transmitter is generally used?
What is three element in drum level?
What is first echo & echo window in radar type level transmitter?
Which types of quections asked in interview for FORMULATION PLANT (PHARMA)
can any one explain in which term we are flow flow is it volumetric r is it mass? and y
How many interlocks at turbine? Plz explain briefly
How to interfacing microcontroller with a DC motor
what is the electrical operation procedure for switching on 27.6MVA electric furnace.
How to control flow variations in magnetic flow maters..... When i will provide proper earthing?
NSV type probe stands for
Specific gravity.
In turbine what does term CDP, NH, HSSOC means.
installation process of orifice,a question asked for confusion creation in interview by BARC 1.if orifice is tightly fitted with pipe ,it will act like venturi 2.if orifice is left hanging in between liquid it will not create the pressure difference exactly,
where are following valves are applicable to install. can any valve be installed any line. globe valve butterfly valve boll valve gate valve