The document / drawing that is primarily used in depicting the
“Bill of Materials (BOM)” of piping system is the

Answer Posted / guest

The document which incorporate the "BOM" and which is also
used for the installation guide for piping is "installation
diagram" or "hook-up diagrams"

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Specify ideal accuracy of flow element like orifice plate, Ventury, Annubar. Ultrasonic flow meter etc.

1489


How can measure flow in oil line?which type of transmitter is generally used?

3550


What is three element in drum level?

932


What is first echo & echo window in radar type level transmitter?

1283


Which types of quections asked in interview for FORMULATION PLANT (PHARMA)

6220






can any one explain in which term we are flow flow is it volumetric r is it mass? and y

1434


How many interlocks at turbine? Plz explain briefly

1529


How to interfacing microcontroller with a DC motor

1255


what is the electrical operation procedure for switching on 27.6MVA electric furnace.

1608


How to control flow variations in magnetic flow maters..... When i will provide proper earthing?

1805


NSV type probe stands for

1972


Specific gravity.

1474


In turbine what does term CDP, NH, HSSOC means.

1345


installation process of orifice,a question asked for confusion creation in interview by BARC 1.if orifice is tightly fitted with pipe ,it will act like venturi 2.if orifice is left hanging in between liquid it will not create the pressure difference exactly,

1674


where are following valves are applicable to install. can any valve be installed any line. globe valve butterfly valve boll valve gate valve

1249