Answer Posted / vijayakumar
the parts of structure used to carry and transfers load of
the structure to the bearing ground locate at more ground
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
can you give me the details of rate analysis of steel and concrete?
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
What are the responsibilities of a construction manager?
What is difference between code and standard and specification?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
In Rcc ratio calculation I wanted to know quantity of Steel also.
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
I need old MMUP exam question and answer for Civil engineering
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
How much for the BRC lapping in full yield and half yield < and which table to get it ?
what is the mix design for M:60 with micro silica andmetakaoline?
Material calculation of cm 1:6 for 1sqm
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
How many axes do cartesian coordinate system has?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.