how much quantity of work we can get by rod benders per day
Answer Posted / amit singh
0.5MT
Is This Answer Correct ? | 10 Yes | 6 No |
Post New Answer View All Answers
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
Aptitude, reasoning, quants, verbal and technical question
How to calculate Volume of Wet cement concrete for a specific grade?
what is modular brick and it size
Detection of a beam & a girder are––––
Cement consumption of one cubic meter of aerocon blocks masonry?
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
please send me bhel questions on rupesh.017@rediffmail.com
Define What is rigging?
how to compute slab reinforcements on step by step procedures??