how much quantity of work we can get by rod benders per day

Answer Posted / sunil

as per my experience..in building..rod bendender do do
quantity...only 3 tons(the steel only less and small dia)

in bridges.1.5- 2 tonn( in slabs and abutments )

including binding also

Is This Answer Correct ?    0 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Minimum and maximum size of the building components

1768


mix design procedure for 1:6 cement mortar

1736


Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings

1645


what"s the sort of beams?

1815


Which is the most prominent tower of world?

631






a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

12680


what is the coefficient for running feet to cft coversion both area and price

1925


Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai

2580


Scaffolding IS code NO.

1776


What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?

665


What is the worlds largest concrete dam?

711


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2049


Is it possible to make a feature using an overdefined sketch?

753


what is Short bored pile foundation.

2197


Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.

2510