As per thumb rule cement required per 1 cum of M20 concrete
is 411Kg/cum(1.57/5.5=0.285cum of cement i.e
0.285*1440=411Kg).But as per PWD rate analysis cement
required is 347Kg/cum.the difference is 64Kg.This kind of
difference is coming every grade of concrete.Can you give
perfect suggestion regarding this.
Answer Posted / karan sardana
this is because you are using design mix instaed of nominal.. the qty of cement in 1 cum of concrete is 411kg, but in design mix the cement consumption is considerably reduced, thats why you are getting this difference always.....
Is This Answer Correct ? | 22 Yes | 2 No |
Post New Answer View All Answers
How to calculate construction cost of residential building in mumbai
Sir how to find cutting length for footing steel bars in the shape of "u"
silt%= silt volume/ silt+sand volume is this right?
how many types of survey and what are levelling instrument?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
Water filter calculation formula
IS code for Rolling Margin of steel
how much required strength of cement concrete bricks(size 230x115x75mm)
What are the different types of civil engineering?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
What is Density of cement, sand & aggregate ?
How much cement will require for 1Rmt Skirting laying
how much of the strength comes from post-production curing