There is one 40MVA oil cooled transformer (yet to
commission), filled with 95% oil and we are trying to fill
5% Nytrogen in that transformer so that there should not be
any foreign component inside. But even though there is no
leakage, nytrogen is not withstanding inside transformer,
within a day or two pressure guage is showing 0. Why is it
soooo? Pls reply.
Answer Posted / k.prakashchandra
Tr is only waterproof (oil)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the test block protection relay if any body know plz explained
hi there i am highly enthusiastic about discussing electrical concepts , and hence i wud lyk to invit al do intrested to join me at gtalk and hav a dscussun of the concepts , ad me as a freind . my email id is rakesh.2k99@gmail.com
why are installed water leakage detection system data centers & server rooms
what are the advantages disadvantages of connecting high voltage block( 1:1 transformers) transformers between the turbo generators and busbars.
how to determine Sq.mm size of finolex power cables.
Brief me about maintenance planning & sheduling of machine tool.
What are the different losses In a de mac1une'! t.xplam
Explain the laying procedure and laying depth of submarine/subsea power cable for 220/400KV system? Also available cable diameter?
Hello to all, Please someone can send me HPCL ELECTRICAL Engg. Sample papers to me? Its urjent....my email address is.... raviasiapacific@gmail.com
I am a possesor of c licence from 1993. I forgot to renew during the year 1998. During that time I was working at TNEB to till date. Is there any possibility to get renewed? or to apply for a new one?
what is the responsibility of C license holder in industry?
What is the transfer function?
how does WTI work ?
limitation of conductor height on ground when we consider EMC
how can we phase identification in a distribution line,how we recognise that which phase is coming for a house hold connection.help me............