can we execute trigger normally at the desired time?
Answer Posted / roopesh kumar
No, it's not possible to shedule timing for a trigger.
In this situation we can shedule a job.
Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
What is ole word?
What is the use of SqlCommandBuilder?
Define Execute Scalar?
What are the drawbacks of using ado.net?
Does sqlclient and oledb class share the same functionality?
What is bubbled event can you please explain?
What is maximum pool size in ado.net connection string?
What do you mean by performing asynchronous operation using command object?
Which components of a data provider is used to retrieve, insert, delete, or modify data in a data source?
How can we add relation between tables in a dataset?
What is ado.net architecture?
What is the use of connection object in ado.net?
Explain the difference between data reader and data adapter?
Is datareader faster than datatable?
What is shadow copy?