Answer Posted / balu
lea chartus
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what do you know that m20,m25
quantity of material needed for rubble stone masonry for 1:4 and 1:6
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
Mention different types of roof systems?
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
what does the track parameter mean in staad.pro?
What is the difference between one-way slab and two-way slab?
how to find out hard strata in bored pile when the DMC method adopted.
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
how do you stabilize a waterlogged area in road construction
Critical Path Method is...