Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the acceptance criteria to determine the "Core
density" of "DBM or BC" course,for any grade as per "MORTH"
guidelines in road construction work ?

Answer Posted / amiya ranjan pattnaik

for DBM The acceptance criteria for tests on density shall
be subject to the condition that the mean value is not less than
the specified value plus:
[1.65 – 1.65/(No.of samples)0.5 ]*times the standard deviation.

Is This Answer Correct ?    11 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

2369


I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

6093


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2506


What is the difference between built area and super built up area?

1263


How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site

1707


do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?

1747


what is labour consume factor in residential projects

2381


how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.

2787


What are the applications of the modulus of elasticity?

1115


What should be the standard roof height like to be?

1229


how to control PQI (Project Quality Index)

10903


Define What is the difference between routing maintenance and major maintenance in school facilities?

1216


I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com

2365


Tell me about triple point of water.

1127


Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?

1693