How to find out the quantity of steel FE415
Answer Posted / jayaraaj
dear friends,
pls check my ans.
if 12mm bar - .62*1.2*1.2 - .89 kg/m
if 16mm bar - .62*1.6*1.6 - 1.59 kg/m
if wrong pls inform
Is This Answer Correct ? | 21 Yes | 5 No |
Post New Answer View All Answers
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
What is the use of offset command?
how to disign cuplock shuttering and it's matireal requirement snd any related web site
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
explain fie benefits of using standard terminology in the measurement process
mean of NH4 pipe
Formula for calculating the volume of bulb in underreamed pile
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
Define different types of roof systems?
What are the problems one might face while having a Cantilever balcony?