Hi i m B.E. In elect. & comm. I m workin in bio mass plant from 6 mnths as inst. Engg. but now i m in dept. Of operation as shift engg...which is best operation or inst. 4 me? M confusd..plz help and reply me..

Answer Posted / banerjeenandan

Being an Instrumentation Dept will be benifitial for you.
That is the core branch

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

The Design Calculation of Level Transmitter For Different Structure open & Closed Vessel, Eg. Diff. Level Tx., Capacitance For Continous Operation

2338


Hi Friends i am going to write BARC written test by this month 20th (20-5-2008). So please if any body knows the details about this or having previous question papers pls mail me to kkumarei@gmail.com. For Suggestions give one message to 9962122264

1984


what do u mean by compensation n pid tunning?in pid tunning what you tunned?is it possible 2 tune p i d

4374


what step is taken for ESD ( emergency shut down) in DCS REPLY to hashimka20009@gmail.com

1890


can you send remote seal interface level transmitter calculation steps for oil water saperator.

2167






What is intrinsic safety mean.

1469


What is the calibration procedure of Drum level transmitter if range is 0 to -400 mmh2o in lab?

1687


List three types Level Switches with their working principles

1625


in mass flow meter what is drive friquancy ?

1629


What is the basic difference between Modbus and CAN Open Protocols

5818


What is the difference between ff transmitter and non ff transmitter

1976


can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know

1630


we want to control pump in let pressure and tank (for exp) our inlet line if water cam and pump will on and when our tank will full pump will off also if our inlet pressure low pump will off even tank not full.this pump i want to uses on our water supply line.

1284


why orfice is not used for main steam flow calculation

1605


, Instrument Index, P&ID review, I/O schedule, datasheet, DCS / Analyzers specifications, loop diagrams, hook-up drawings.

7566