Answer Posted / himanshu sekhar pradhan
It is the density of solid w.r.t density of
water.
Sp. gravity of solid = (weight of solid -Entraped air)/
volume of given solid.
Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
What is the worlds largest concrete dam?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
what is a well
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
What is the difference between yeild strength and compressive strength of steel???
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
Define What is the meaning of a blue land surveyors flag?
why is the column design?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
What year was the keystone power plant in Indiana County constructed?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT