why need to be maintain power factor for industrial
customer?

Answer Posted / natha

low pf means high sizing of cables and equipments.more heating of devices and loss.more power drawn at the point of common coupling pcc.so economically draining activity.thus pf near to unity required.

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can calculate 1kva generator running time in 1 liter keroscene

2109


1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)

1811


please send me last 5 year interview questions

1671


Keywords: Die, Card, Coin, B/N 2 To 12

804


In all analog voltmeters or ammeter showing some small size symbols. as well as a star and in star 2no. digit, resister symbol,and other. what is that's meaning ?

1586






how can i get the formula to find out the cable size if i know the load of main fuse protection.

1437


what is the standard values(Megger test) of resistances between L&N,L&E and N&E for a system on IEE regulations?

1661


why asa method ZPF method is more accurate than ASA method?

5326


5- What is the task (function) of the excitation and isolation transformers in power plant? 6- What is the task (function) of LCI (A), LCI (B) and LCI (COS) in power plant? : LCI (A) and LCI(B) are load commutating inverter for generator turbine starting. , LCI (COS) is load commutating inverter change over switch

3361


WHY IN AC DRIVES,INPUT PHASE CURRENT SHOW UNBALANCE?

1725


Is Transol transformer oil comparable to nynas nytro libra?

2627


what is the difference between b c d curves on mcb

1342


What is method of calculating the fault current for a MDB, 50KW, 3PH, 415V, 50HZ?

1698


I want definition for ABT Meter (Availability Based tariff) ?

1528


why ahould you show client/engineer activities clearly on the project plan

2348