why in scott connection of transformers, main transformer is
tapped at 50% and teaser transformer at 86.6%?
Answer Posted / natha
draw associated phasors
Is This Answer Correct ? | 7 Yes | 14 No |
Post New Answer View All Answers
i have been tasked with a design of protection, metering and control(PMC) relay panel extension to accommodate all PMC relays.There is an already existing panel where this one will be built.What are the design aspects for this kind of project? thank you.
How to know Resistance and Reactance value of main and aux winding of single phase capacitor start capacitor run induction motor to find capacitor value?
i need some project topics along with circuit diagram in the electrical adnd electronics engg and also give ome website regarding projects.my mail id is thenmozhi2k7@gmail.com .please help me.
Pl.brief me about Electrical power distribution system from Main generating station to Industry.What is the use of in between station.
Please explain me about Relay curves and their sources to read ?
how to set the time in digital timer ?
What is mean by spike arrester(Voltage Operated)
why do we use spark detector inside the slip ring brush compartment 0ona slip ring induction motor?
How to decide whether A / B / C / D curve type MCB should be used?
During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.
What is meant by full pitched winding?
What is the maximum and minimum rating of UPS?
what r PID controllers?why they r used?what is there purpose?plz Explain in detail
WHAT IS THE PARTIAL DISCHARGE TEST?
How to know the following data of synchronous generator 1. D-Axis Unsaturated Reactance 2. D-Axis Unsaturated Transient Reactance 3. D-Axis Unsaturated Sub - Transient Reactance