Answer Posted /

Is This Answer Correct ?    Yes No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can you change a master page dynamically at runtime? How?

495


What devices will support ios 7?

468


What are abiotic factors?

158


Explain the uses of b+ tree.

527


Hi , actually i just wanted to apply on L1B blanket on Specialized skills. just i need template of roles and resposibilities in USA.

2088






Does huawei have its own os?

481


Question that will be ask for master interview

1423


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

1679


What are the differences among a system call, a library function, and a unix command?

559


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

1788


Is Neosporin affected on Streptococcus.auerus?

1750


what are the factors to be considered while design the breaker either HT or LT??

1400


What are the key features of d3.js?

5


You are the project manager working on a research project for a new drug treatment. Your preliminary project schedule runs past the due date for a federal grant application. The manager of the R&D department has agreed to release two resources to work on your project in order to meet the federal grant application date. This is an example of: A. Crashing B. Fast trucking C. Resource leveling D. Adjusting the resource calendar

651


How do you repeat an action in excel?

293