what"s the formula to find the cement,sand,aggreegate(45mm)
requirement for PCC?

Answer Posted / vishnu soni

For 1 cum concrete 1:4:8, then we reqd following
quantities:-
1.54/sum of ratio
1.54/13= .11/.034=3.48 bags of cement
Fine Aggregate:-- .11x4=.44 cum
Coarse aggregate:-- .11x8=.88cum

Is This Answer Correct ?    55 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

1832


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

918


What is gravity flow?

685


How to make a c++ program that converts any base to base 10?

1625


Which are the top apps for you civil engineering?

687






Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??

1174


Please tell me vasthu room sizes. Thanks.

1766


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

1632


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

705


What is Base Shear ?

675


I need model question papers for writing the Dubai municipality exam,for G+1

9408


how we calculate the vol.of wet concrete..?

1416


What is the software used in civil engineering?

665


what is Short bored pile foundation.

2201


how to calculate mivan shuttering matrial

979