what"s the formula to find the cement,sand,aggreegate(45mm)
requirement for PCC?
Answer Posted / vishnu soni
For 1 cum concrete 1:4:8, then we reqd following
quantities:-
1.54/sum of ratio
1.54/13= .11/.034=3.48 bags of cement
Fine Aggregate:-- .11x4=.44 cum
Coarse aggregate:-- .11x8=.88cum
Is This Answer Correct ? | 55 Yes | 18 No |
Post New Answer View All Answers
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
What is gravity flow?
How to make a c++ program that converts any base to base 10?
Which are the top apps for you civil engineering?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
Please tell me vasthu room sizes. Thanks.
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
What is Base Shear ?
I need model question papers for writing the Dubai municipality exam,for G+1
how we calculate the vol.of wet concrete..?
What is the software used in civil engineering?
what is Short bored pile foundation.
how to calculate mivan shuttering matrial