Question How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?
 Question Asked In Companies :: JP Group, Simplex, Boss Global, Kerakoll, NextGen,     < I also faced this Question! >
 Question Submitted By :: banmayank
  Answer Posted By  
the procedure to calculate quanity is given below

RATIO (1:6)

NOTE = 1:6: 0.55(Water) = + (7.55)

CEMENT = 1m3/7.55 x 1 = 0.132m3 (No of Kg = 0.132 x 1506 =

Sand = 1m3/7.55 x 6 = 0.794m3 (No of Kg = 0.132 x 1650 =
437.250 kg)

Water = 1m3/7.55 x 0.55 = 0.072 m3 ( No of Kg = 0.072 x
1000 = 72liter)

Is This Answer Correct ?    20 Yes 52 No

  syed mahaboob hussain
View All Answers
Please Help Members By Posting Answers For Below Questions
 Question Views   Select
what's the formula for calculate pcc for matt(45mm aggregate)? 765
What do you mean by tolerance factor of concrete ? 1075
Scaffolding IS code NO. 554
what is Quantity of stone and sand required for one cubic meter of stone work (UCR) 165
how to calculate the no of cement bags required for 100sqft of area 12 mm thick plastering in proportion of 1:3,1:4,1:5,1:6? 741
How to make a c++ program that converts any base to base 10? 351
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none 332
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used? 421
what is meant by shear center????? 646
cud any one send me tech quest paper(civil engg) at 469
what is the meaning of degreasing of the euipment or line. 1433
how can economic during construction of a project. 365
Should column area deducted from form work measurement of slab in building? 1145
How to find out slope footing concrete 948
How much time Required for PPR pipe network testing 401