Question How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?
 Question Asked In Companies :: JP Group, Simplex, Boss Global, Kerakoll, NextGen,     < I also faced this Question! >
 Question Submitted By :: banmayank
  Answer Posted By  
 
Answer
the procedure to calculate quanity is given below

RATIO (1:6)

NOTE = 1:6: 0.55(Water) = + (7.55)

CEMENT = 1m3/7.55 x 1 = 0.132m3 (No of Kg = 0.132 x 1506 =
198.792kg)

Sand = 1m3/7.55 x 6 = 0.794m3 (No of Kg = 0.132 x 1650 =
437.250 kg)

Water = 1m3/7.55 x 0.55 = 0.072 m3 ( No of Kg = 0.072 x
1000 = 72liter)

Is This Answer Correct ?    20 Yes 52 No


 
  syed mahaboob hussain
 
View All Answers
 
 
Please Help Members By Posting Answers For Below Questions
 
 Question Views   Select
 
what is the name of shuttering oil used in oman 262
specifications of fe500 steel 1708
what is parametre for M25 after 7 days strength 45
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer. 331
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO???? 495
how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate 562
Draw the cross section of a boundary wall and label its part with detailing? 1387
it is a corrected question." make a list of engineering property(properties) of soil. 492
What is type failure of road surface? how to repair the failure of road surface? 676
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu) 444
why we use aggregate,sand with cement in concrete? 3648
will fix foundation bolts at site with out template is there any procedure? 806
How can we convert weight batch to volume batch for m30 mix 154
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code? 455
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this? 95