Answer Posted / ch javed
FULL ARC: means governor v/v are fully opened and steam flow
is being controlled by main stop valve(MSV).
PARTIAL ARC: means main stop valve (MSV)is fully opened and
the governor v/v are controlled the steam flow.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What happens when too much cylinder oil is injected in the working cylinder?
What is net refrigerating effect of the refrigerant?
what is heat treatment and why is it done?
what is difference between british wire guage & birmingham wire guage
What is an oil mist detector
What is the purpose of air blow?
Hello i am appearing for the BHAVINI written exam 2014 for the post of Technical Officer(Mechanical). Can anyone tell me what topics to prepare?
Who discovered non-newtonian fluids?
can any body send me previous year model papers of BEL and BHEL PLZ mail to manume31@gmail.com
written test: 1) periodical and monthly maintenance are called preventive or panned maintenance. 2) Mechanical seal parts and their material. 3)Urea plant main parts and their construction material details.4)Name diagram of the given turbine5) Turbine nomenclature like API name.6)All types of corrosion like Galvanic and oxide with example.7)Parts of gate valve and its usage. diaphragm gate valve usage. etc.....
Where mixed flow type compressors are used?
Which reactor uses heavy water as moderator ?
Checking points in steering gear system?
what is diameter of a suction pipe?
how many work softner filter ,multy media filter ,cartage filter , in r o system