what is the difference between onw way slab & two way slab?
Answer Posted / k garg
when Ly/Lx ratio is less than 2 then it is one way slab.
and if it is greater than 2 then it is two way slab.
it is valid only if all the four sides are supported. if the sides are not supported then it'll be one way slab independent of Ly/Lx ratio.
Is This Answer Correct ? | 28 Yes | 41 No |
Post New Answer View All Answers
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
For Wet Mix Mecadam design what is Optimum moisture content
How can you produce desired alloys and discuss their applications in daily life.
What is Curtailing of R/F
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
Explain what is zoning permit?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
what is the use in canals of longitudinal drains and cross drains in lining areas?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
can you give me the details of rate analysis of steel and concrete?
brickwork labour rate per cum ?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?